Pricing
So you can rule us out without a call
Most firms in this trade will not put a number anywhere, so the only way to find out whether you can afford them is to sit through discovery and a proposal. Here is the shape of the work, how long each kind takes, and exactly how the number gets set.
Why this page exists
So you can rule us out without a call
Most firms in this trade will not put a number anywhere, which means the only way to find out whether you can afford them is to sit through a discovery call and a proposal. That is two or three weeks of your time to learn something that could have been a sentence.
So here is the shape of it: what each kind of project is, and how long it takes. The figures are deliberately not on this page yet, because a number we publish and then decline to honour is worse than no number at all. Ask on the call and you will get one in the first ten minutes.
The work
What a project is, and how long it runs
| Project | Typical length | Range |
|---|---|---|
| Systems integration, one seamOne system talking to another: ERP to QuickBooks, ERP to the carrier, CAD bill of materials to purchasing. The field map, the error handling and the runbook. | 3 to 8 weeks | On the call |
| Material and lot traceabilityHeat capture at receipt, lot to job linking at the cut, split and remnant handling, the gap report and a one click certificate pack. | 3 to 8 weeks | On the call |
| ERP reporting people can changeA read only replica, a named view layer agreed with the people who use the words, and reports your own team can edit without us. | 3 to 6 weeks | On the call |
| Hardening a system you built yourselfBackups with a restore you watch, a login per person, an audit trail where it counts, constraints, migrations, tests on the arithmetic and a runbook. | 3 to 6 weeks | On the call |
| OEE and downtime captureCapture at the machine, reasons the operators will actually pick, and a number that arrives before the quarter closes. | 6 to 10 weeks | On the call |
| Production schedulingA schedule that lives in one place, that the planner trusts more than the spreadsheet, and that somebody other than the planner can run. | 6 to 12 weeks | On the call |
| Product configurator and quotingRules that refuse impossible combinations and say why, a bill of materials resolved from the choices, and the payload production receives. | 8 to 16 weeks | On the call |
| Dynamics GP to Business Central migrationCustomisation and integration inventory first, then data, then the rebuilds. Scoped after the inventory exists, never before. | 3 to 9 months | On the call |
Integration is the usual starting point, and that is deliberate on both sides. It is the smallest piece, and it is how you find out whether we can be trusted near a production system before anything larger is on the line.
How it is set
Discovery first, then a fixed price
If you would rather run it by the day than by the project, we will do that, and we will tell you when it is the cheaper option for you. It usually is for small, open-ended work, and it usually is not for anything with a defined end.
What moves it
Six things that change the number, in rough order of how much
What you never pay for
No licence, no lock-in, no percentage
If the budget is not there
What to do instead, honestly
Plenty of shops reading this should not spend money with anybody yet, and we would rather say that than take a project that strains you.
FAQ
Common questions
Why will you not give a price before discovery?
Because the number depends almost entirely on things nobody can see from outside: whether your ERP lets data out, how clean the part numbers are, how many systems have to agree. A firm that quotes before looking is guessing, and the gap between the guess and reality arrives later as change orders. We would rather charge for one or two weeks of looking and then commit.
Is the discovery work useful if we do not go ahead?
Yes, and that is the point of charging for it rather than giving it away. The deliverable is a written specification of what has to be built, with the integration and customisation inventory behind it. You own it outright and you are welcome to take it to another firm or build from it yourself. Several people have.
Do you work with small shops?
Sometimes, and sometimes we are the wrong answer. If you are under about ten people and the problem is that nothing is written down yet, a packaged system or an organised paper process will serve you better than anything custom. What we are good at is the specific gap a package cannot cover, and that gap tends to appear once a business is big enough to have a process worth encoding.
Will you quote us an improvement percentage?
No. Every competitor does and the numbers are invented, which anyone who has been through an implementation already knows. What we will commit to is that the number you are missing will exist, be trustworthy, and arrive before the quarter closes rather than three weeks after it.
What happens if the project runs over?
On fixed price work, our estimate being wrong is our problem, and we absorb it. What changes the price is you changing the scope, which is priced the same way as the original work, in writing, before anybody starts. The line between those two is drawn in the discovery document precisely so it does not have to be argued about later.
Keep exploring
Related
- What we actually doThe short version, written to be forwarded
- All servicesEvery kind of project
- Partner programmeIf you advise manufacturers
Next step
Ask for the number on the first call.
Forty minutes, free. You will leave knowing roughly where your problem sits in the table above, or that you should not spend money on it yet.
- Email usmail@voliom.com