Manufacturing operations

Software for Manufacturers, built around your floor

Production is tracked on paper or in a spreadsheet that one person maintains, the ERP is a day behind the floor, and every site keeps its own version of the stock number.

Where it hurts

If more than two of these are true, there is a project here

We hear these from plant managers, operations directors and the COO more than anything else.

  • Operators log production on paper, and somebody types it in the next morning
  • Two plants report the same SKU differently and nobody can say which is right
  • Downtime gets discussed in the morning meeting instead of measured
  • The ERP holds the truth but nobody on the floor can see it
  • Quality checks live in a binder that only matters during an audit

What we build

The pieces that usually matter first

Shop-floor logging app

Tablet or kiosk entry at the line, built for gloves and bad lighting

Downtime and scrap capture

Reason codes at the moment it happens, not reconstructed later

Digital work orders and travellers

The job packet on a screen, with the current revision

Multi-site stock view

One number per SKU across every plant and outlet

ERP sync

Production, consumption and stock moving both ways on a schedule you set

Operations dashboards

Output, yield and downtime by line, by shift, daily

How we start

Small, and in production

We usually start with one line or one plant, four weeks, and a working app the operators actually use. If it does not survive contact with the floor there is nothing to roll out.

FAQ

Common questions

Our ERP has no API. Is this still possible?

Usually yes. Plenty of regional and older ERPs have no public API, and the answer is a read-only database connection, a scheduled export, or the file drop the system already produces. It changes the design and the cost, not the outcome. We confirm which applies in the first few days, before quoting.

Will operators actually use it?

They use it when it is faster than the paper it replaces. That means a handful of large buttons, no logins to type, offline tolerance, and nothing that makes them wait on a network. We design for that first and the reporting second.

Do we have to replace our ERP?

No, and we would argue against it. Replacing an ERP is a two-year project with a high failure rate. Putting a usable layer on top of it, and syncing properly, gets you most of the benefit in weeks.

What does a project like this cost?

It depends on scope and we quote it line by line after a call, never before. We run two delivery tracks: a blended squad at roughly $24 to $45 per hour for straightforward builds, and a senior-only pod at roughly $75 to $120 per hour where architecture, security review and a compressed timeline matter. Most first projects here land in the four to six week range.

Let's talk

Tell us what you're building.

Get a free 30-minute strategy call. You'll leave with a clear plan, a realistic estimate and our honest opinion — whether or not you work with us.